Upload a scope of work, BOQ, or contract. Milesto's AI reads it, understands the requirements, and generates a complete project structure: milestones, tasks, deliverables, dependencies, and cost estimates.
Every project starts with a document: a scope of work, a bill of quantities, a contract, or a set of technical specifications. Translating that document into a structured project plan is tedious, error-prone, and takes days. Milesto's AI Draft feature reads your documents, extracts every requirement, and builds the complete project hierarchy in under 2 minutes. It uses industry-specific templates (EPC, Construction, O&M, General) to ensure realistic sequencing, proper dependency chains, and cost distribution that matches your document's structure. Review the generated plan, refine it with natural language instructions, and accept it to create your live project.
Upload PDF, DOCX, XLSX, or plain text documents. The AI extracts structured facts (dates, scope items, costs, quantities, and specifications) and uses them to build your plan. Multiple documents can be analyzed together.
The AI generates milestones (project phases), tasks (work packages), and deliverables (completable items) with realistic durations, weights, and cost estimates. Dependencies between tasks are set automatically based on logical sequencing.
Four built-in templates: EPC, Construction, O&M, and General. The AI fills the template based on your document content, ensuring Fri/Sat weekends for Middle East projects, realistic construction durations, BOQ-based cost distribution, and proper phase sequencing.
After reviewing the generated plan, ask the AI to refine it: "Split the MEP milestone into Electrical and Plumbing", "Add a testing phase after installation", "Increase procurement durations by 2 weeks". The AI updates only what you asked for, preserving everything else.
The AI flags contradictions in your documents (different dates, conflicting costs) as Conflicts, and data gaps it filled with reasonable defaults as Assumptions. Review both before accepting the plan.
After your plan is created, use the AI Chat to ask questions ("Which tasks are on the critical path?"), run What-If simulations ("What if procurement slips 2 weeks?"), and give commands ("Assign all Testing deliverables to Sarah").
Translating a 100-page scope of work into a WBS manually takes 3-5 days and invariably misses items.
Upload the document and get a complete project structure in under 2 minutes. The AI reads every section and maps requirements to milestones, tasks, and deliverables with cost estimates.
Project plans created by different PMs have inconsistent structures, naming conventions, and detail levels.
Industry templates enforce consistent structure. Every AI-generated plan follows the same hierarchy pattern, naming conventions, and detail level appropriate to the project type.
Documents often contradict each other - the contract says 12 weeks but the spec says 16 weeks.
The AI flags document contradictions as Conflicts that you review before accepting the plan. No silent assumptions. Everything is visible.
Updating the plan after a scope change means manually restructuring tasks and recalculating dates.
Describe the change in plain English and the AI updates the affected parts of the plan while preserving everything else. 10 refinements per month included.